Delay Analysis and EOT Claims via Primavera P6
Strengths
Integrated Tooling and Theory
The curriculum connects delay analysis methods directly to Primavera P6 implementation, covering both prospective and retrospective techniques.

Comprehensive Guide to Delay Analysis, EOT, and Claims Using Primavera P6 with FIDIC Contracts for Construction Projects
InstructorWaheed AnwarComidoc has tracked 1 coupon for this course since 2026, last checked 6d ago.
| Coupon code | Discount | Added | Status | Lifetime |
|---|---|---|---|---|
| E18AA235C3EB89ECCED0 | 100% off | Fully redeemed | 1d 13h |
The curriculum connects delay analysis methods directly to Primavera P6 implementation, covering both prospective and retrospective techniques.
Editorial course preview
These 4 complementary views highlight concrete, legible examples from the course presentation.
This Primavera P6 screenshot illustrates a detailed construction schedule analysis, showing specific activities like excavation and foundation work alongside identified client delay events.
This document outlines specific causes for project delays, such as the late issuance of construction drawings and slow approval of contractor submissions.
This interface displays the Distribution Graph tool in Primavera P6, visualizing risk analysis data with a cumulative frequency curve and statistical metrics for project duration.
This course curriculum outlines prerequisites for delay analysis training and lists eight modules covering project management basics, contract principles, and Primavera P6 methods.








Instruction includes a comparative study of various international contract standards, including FIDIC, JCT, and NEC.
One signal from August 2025 suggests that technical demonstrations, specifically regarding window impact analysis, may lack the depth required to reflect large-scale project complexities. Note that while the course has a more recent update label, this specific review predates it and does not prove the issue was corrected.
One signal from December 2025 suggests the instructional format can lean toward written definitions and lectures rather than extensive hands-on software sessions. This review also predates the displayed update label, which does not guarantee a correction in delivery style.
The curriculum aligns well with the needs of construction professionals and those entering contract management roles.